I0220 over RED RIVER/LA 3049/538


+32.55674, -93.76814
32°33'24" N, 93°46'05" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.


Name:I0220 over RED RIVER/LA 3049/538
Structure number:040804513100001
Location:.01 MI EAST OF LA 3049
Purpose:Carries highway over highway and waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:274.9 ft. [83.8 m]
Total length:3302.3 ft. [1006.5 m]
Roadway width between curbs:79.1 ft. [24.1 m]
Deck width edge-to-edge:84.3 ft. [25.7 m]
Vertical clearance below bridge:230.0 ft. [70.1 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1977
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:20
Main spans material:Steel continuous [4]
Main spans design:Girder and floorbeam system [03]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: July 2017 

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:44,700 [as of 2015]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Superior to present desirable criteria [9]
Underclearances appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:48.8 tons [44.4 metric tons]
Inventory rating:28.9 tons [26.3 metric tons]
Sufficiency rating:71.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$25,432,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
July 201771.1GoodGoodGoodGoodFO44700
August 201570.9GoodGoodGoodGoodFO44700
August 201370.9GoodGoodGoodGoodFO40500
August 201170.9GoodGoodGoodGoodFO35500
November 201070.9GoodGoodGoodGoodFO37100
December 200870.9GoodGoodGoodGoodFO35600
July 200770.9GoodGoodGoodGoodFO32100
November 200656.9GoodGoodGoodGoodFO33400
November 200456.9GoodVery GoodVery GoodGoodFO38000
December 200256.9GoodVery GoodVery GoodGoodFO46600
May 200168.3GoodVery GoodVery GoodGoodFO1367
December 200068.3GoodVery GoodVery GoodGoodFO1367
November 199862.0GoodVery GoodVery GoodGoodFO21542
March 199762.0GoodVery GoodVery GoodGoodFO21531
May 199562.0GoodVery GoodVery GoodGoodFO31840
November 199462.0GoodVery GoodVery GoodGoodFO30257
April 199262.0GoodVery GoodVery GoodVery GoodFO21316