HWY CUMMINS HWY over RR MBTA
Map
Coordinates:
+42.26972, -71.0980642°16'11" N, 71°05'53" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.
Facts
Name: | HWY CUMMINS HWY over RR MBTA |
Structure number: | B161663H4DOT634 |
Location: | 2000FT NW OFJCTSR28&SR138 |
Purpose: | Carries highway and pedestrian walkway over railroad |
Route classification: | Other Principal Arterial (Urban) [14] |
Length of largest span: | 86.0 ft. [26.2 m] |
Total length: | 90.9 ft. [27.7 m] |
Roadway width between curbs: | 56.1 ft. [17.1 m] |
Deck width edge-to-edge: | 80.7 ft. [24.6 m] |
Vertical clearance below bridge: | 18.4 ft. [5.6 m] |
Skew angle: | 8° |
Owner: | State Highway Agency [01] |
Year built: | 1901 |
Year reconstructed: | 1994 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Main span material: | Prestressed concrete [5] |
Main span design: | Box beam or girders - Multiple [05] |
Deck type: | Concrete Precast Panels [2] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: November 2016
Good/Fair/Poor Condition: | Good |
Status: | Open, no restriction [A] |
Average daily traffic: | 20,000 [as of 2016] |
Truck traffic: | 5% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Good [7 out of 9] |
Structural appraisal: | Better than present minimum criteria [7] |
Deck geometry appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Underclearances appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Roadway alignment appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Scour condition: | Bridge not over waterway. [N] |
Operating rating: | 92.8 tons [84.4 metric tons] |
Inventory rating: | 72.3 tons [65.7 metric tons] |
Sufficiency rating: | 91.0 |
Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
Estimated cost of work: | $1,805,000 |
Previous Inspections
Date | Suff. Rating | Condition | Deck | Superstructure | Substructure | SD/FO | ADT |
---|
November 2016 | 91.0 | Good | Good | Good | Good | FO | 20000 |
November 2014 | 90.5 | Good | Good | Good | Good | FO | 24500 |
November 2012 | 90.6 | Good | Good | Good | Good | FO | 24100 |
November 2010 | 90.6 | Good | Good | Good | Good | FO | 23900 |
November 2008 | 90.6 | Good | Very Good | Very Good | Very Good | FO | 23700 |