Facts

Name:HWY RESERVATN RD over WATER MOTHER BROOK
Structure number:B1618638LMUNNBI
Old structure number:38LMUN896186100 (from 1992 edition)
Location:.48 KM NW HYDE PARK AVE
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:65.3 ft. [19.9 m]
Total length:71.2 ft. [21.7 m]
Roadway width between curbs:27.2 ft. [8.3 m]
Deck width edge-to-edge:40.0 ft. [12.2 m]
Skew angle:36°
Owner:City or Municipal Highway Agency [04]
Year built:1898
Year reconstructed:1996
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: October 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:5,000 [as of 2016]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:70.3 tons [63.9 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Sufficiency rating:78.1
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$1,447,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
October 201678.1GoodGoodVery GoodGoodFO5000
October 201482.4GoodGoodVery GoodGood-3400
October 201288.9GoodVery GoodVery GoodGood-2300
October 201088.9GoodVery GoodVery GoodGood-2500
October 200888.9GoodVery GoodVery GoodGood-2500
October 200689.1GoodVery GoodVery GoodGood-900
October 200482.5GoodVery GoodVery GoodGood-3200
October 200288.9GoodVery GoodVery GoodGood-2300
October 200089.0GoodVery GoodVery GoodGood-1900
October 199888.9GoodVery GoodVery GoodVery Good-2000
October 199670.7GoodVery GoodVery GoodVery Good-8900