HWY W FOURTH ST over WATER FORT POINT CHANNEL

Map

Coordinates:
+42.34262, -71.06104
42°20'33" N, 71°03'40" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:HWY W FOURTH ST over WATER FORT POINT CHANNEL
Structure number:B162762L3DOTNBI
Location:.32 KM S I-90
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:20.0 ft. [6.1 m]
Total length:41.0 ft. [12.5 m]
Roadway width between curbs:55.1 ft. [16.8 m]
Deck width edge-to-edge:64.0 ft. [19.5 m]
Owner:State Highway Agency [01]
Year built:1958
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: June 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:26,250 [as of 2017]
Truck traffic:10% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:78.0
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$934,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
June 2017Fair6 out of 102625078.0
June 2015Fair6 out of 102300078.3
June 2013Fair6 out of 101860078.9
June 2011Fair6 out of 101760079.0
June 2009Fair6 out of 101760079.0

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Culvert
Reinforced Concrete Culvertlinear ft.2890273160
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.5050000