HWY COMM AV OFRP over WATER MUDDY RIVER

Map

Coordinates:
+42.34833, -71.09192
42°20'54" N, 71°05'31" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:HWY COMM AV OFRP over WATER MUDDY RIVER
Structure number:B163654FDDOTNBI
Location:.2 MI S OF ST RTE 2A
Purpose:Carries highway overpass over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:73.2 ft. [22.3 m]
Total length:278.2 ft. [84.8 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:33.8 ft. [10.3 m]
Skew angle:17°
Owner:State Highway Agency [01]
Year built:1965
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Girder and floorbeam system [03]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: June 2017

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:6,100 [as of 2017]
Truck traffic:4% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:40.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$9,254,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
June 2017PoorPoorFairPoor610040.5
June 2015PoorPoorFairPoor820840.5
June 2013PoorPoorFairPoor650040.5
June 2011PoorPoorFairPoor2700040.5
June 2009PoorPoorFairFair2700056.5

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.1,32404808440
Steel Protective Coatingsq. ft.10,7671,031009,736
Deck
Reinforced Concrete Decksq. ft.9,52402,6886,358478
Wearing Surfacessq. ft.6,7561,5394,1541,0630
Substructure
Reinforced Concrete Columneach30120
Reinforced Concrete Pier Walllinear ft.41325130
Reinforced Concrete Abutmentlinear ft.692632110
Reinforced Concrete Pier Caplinear ft.42519180
Joints
Other Jointlinear ft.2017289400
Bearings
Movable Bearingeach208750
Steel Protective Coatingsq. ft.60035025
Fixed Bearingeach20101000
Steel Protective Coatingsq. ft.601025025
Bridge Rail
Other Material Bridge Raillinear ft.5599926580115