Share:

I 90 over WATER COOLEY BROOK

Map

Coordinates:
+42.16558, -72.56019
42°09'56" N, 72°33'37" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:I 90 over WATER COOLEY BROOK
Structure number:C130244HTDOTNBI
Old structure number:MTA209024101 (from 1992 edition)
Location:.3MI.S.CHICOPEE RESERVOIR
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Tolls:Yes, on toll road [2]
Length of largest span:7.9 ft. [2.4 m]
Total length:26.2 ft. [8.0 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1957
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: January 2018

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:56,574 [as of 2016]
Truck traffic:12% of total traffic
Structural appraisal:Better than present minimum criteria [7]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:71.3
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$1,091,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
January 2018Good7 out of 105657471.3
January 2016Good7 out of 103141579.6
January 2014Good7 out of 103141579.6
January 2012Good7 out of 103141579.6
January 2010Good7 out of 103141579.6
February 2000Good7 out of 103141576.6
March 1996Fair6 out of 103307476.0
March 1994Fair6 out of 102769977.0
March 1992Fair6 out of 102789676.9

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Culvert
Reinforced Concrete Culvertlinear ft.6485886000