HWY DEPOT ST over WATER BLACKSTONE RIVER
Map
Coordinates:
+42.17375, -71.6805742°10'25" N, 71°40'50" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | HWY DEPOT ST over WATER BLACKSTONE RIVER |
Structure number: | G080101BVMUNNBI |
Location: | JUST W OF RTE 122 |
Purpose: | Carries highway and pedestrian walkway over waterway |
Route classification: | Collector (Urban) [17] |
Length of largest span: | 67.9 ft. [20.7 m] |
Total length: | 67.9 ft. [20.7 m] |
Roadway width between curbs: | 20.0 ft. [6.1 m] |
Deck width edge-to-edge: | 29.5 ft. [9.0 m] |
Skew angle: | 3° |
Owner: | Town or Township Highway Agency [03] |
Year built: | 1925 |
Historic significance: | Historical significance is not determinable at this time [4] |
Main span material: | Concrete [1] |
Main span design: | Arch - Deck [11] |
Deck type: | Not applicable [N] |
Latest Available Inspection: September 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, would be posted or closed except for temporary shoring [D] |
Average daily traffic: | 2,600 [as of 2012] |
Truck traffic: | 5% of total traffic |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Countermeasures have been installed to mitigate an existing problem with scour. [7] |
Sufficiency rating: | 48.0 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Estimated cost of work: | $958,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
September 2018 | Fair | - | Fair | Satisfactory | 2600 | 48.0 |
September 2016 | Fair | - | Fair | Satisfactory | 2600 | 48.0 |
September 2014 | Fair | - | Fair | Satisfactory | 2600 | 47.0 |
September 2012 | Fair | - | Fair | Satisfactory | 2600 | 47.0 |
September 2010 | Fair | - | Satisfactory | Satisfactory | 2600 | 58.0 |
September 2008 | Fair | - | Satisfactory | Satisfactory | 2600 | 58.0 |
September 2006 | Fair | - | Satisfactory | Satisfactory | 2600 | 58.0 |
September 2004 | Fair | - | Satisfactory | Satisfactory | 2600 | 58.0 |
September 2002 | Good | - | Good | Good | 2600 | 58.0 |
September 2000 | Good | - | Good | Good | 3800 | 58.0 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Deck |
Reinforced Concrete Deck | sq. ft. | 408 | 408 | 0 | 0 | 0 |
Superstructure |
Reinforced Concrete Arch | linear ft. | 68 | 20 | 24 | 24 | 0 |
Substructure |
Reinforced Concrete Abutment | linear ft. | 60 | 52 | 8 | 0 | 0 |
Bridge Rail |
Reinforced Concrete Bridge Rail | linear ft. | 186 | 1 | 140 | 45 | 0 |