Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:US 13 BU over POCOMOKE RIVER
Structure number:100000230004010
Location:ON SOMERSET CO LINE
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:65.0 ft. [19.8 m]
Total length:275.9 ft. [84.1 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:31.5 ft. [9.6 m]
Vertical clearance below bridge:3.3 ft. [1.0 m]
Owner:State Highway Agency [01]
Year built:1920
Year reconstructed:1981
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Main span material:Steel [3]
Main span design:Movable - Bascule [16]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: December 2017

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:3,385 [as of 2014]
Truck traffic:8% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:61.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$983,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
December 2017FairFairFairFair338561.9
December 2015FairFairSatisfactoryFair338563.5
December 2013FairFairSatisfactoryFair340047.9
December 2011FairFairSatisfactoryFair340047.7
December 2009FairFairSatisfactoryFair293047.8
December 2007FairFairSatisfactoryFair412547.6
December 2005FairSatisfactoryGoodSatisfactory412553.8
December 2003FairSatisfactoryGoodSatisfactory412553.8
May 2002FairSatisfactoryGoodSatisfactory292554.0
May 2001FairSatisfactoryGoodSatisfactory292554.0
May 2000FairSatisfactoryGoodSatisfactory292554.0
May 1999FairSatisfactoryGoodSatisfactory292554.0
April 1998FairSatisfactoryGoodSatisfactory292554.0
June 1997FairSatisfactoryGoodSatisfactory292554.0
June 1995FairSatisfactoryGoodGood292565.5
June 1994FairSatisfactoryGoodGood292565.5
June 1993FairSatisfactorySatisfactorySatisfactory292565.5
June 1992FairSatisfactorySatisfactoryGood292565.5
May 1990GoodGoodGoodGood292565.5