MARYLAND AVENUE over I-83, MTA AND AMTRAK
Map
Coordinates:
+39.30833, -76.6183339°18'30" N, 76°37'06" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.
Facts
Name: | MARYLAND AVENUE over I-83, MTA AND AMTRAK |
Structure number: | 200000BC1404010 |
Location: | 0.2 MI S OF NORTH AVE |
Purpose: | Carries highway and pedestrian walkway over highway and railroad |
Route classification: | Other Principal Arterial (Urban) [14] |
Length of largest span: | 109.9 ft. [33.5 m] |
Total length: | 518.1 ft. [157.9 m] |
Roadway width between curbs: | 52.2 ft. [15.9 m] |
Deck width edge-to-edge: | 65.9 ft. [20.1 m] |
Vertical clearance below bridge: | 15.1 ft. [4.6 m] |
Skew angle: | 29° |
Owner: | City or Municipal Highway Agency [04] |
Year built: | 1959 |
Year reconstructed: | 1993 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 18 / H 20 [4] |
Number of main spans: | 2 |
Main spans material: | Steel [3] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: November 2016
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 20,275 [as of 2013] |
Truck traffic: | 5% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Equal to present minimum criteria [6] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Underclearances appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Scour condition: | Bridge not over waterway. [N] |
Inventory rating: | 73.4 tons [66.7 metric tons] |
Sufficiency rating: | 76.5 |
Recommended work: | Other structural work, including hydraulic replacements. [38] |
Estimated cost of work: | $13,000 |
Previous Inspections
Date | Suff. Rating | Condition | Deck | Superstructure | Substructure | SD/FO | ADT |
---|
November 2016 | 76.5 | Fair | Good | Good | Satisfactory | FO | 20275 |
November 2014 | 76.5 | Fair | Good | Good | Satisfactory | FO | 20275 |
November 2012 | 76.6 | Fair | Good | Good | Satisfactory | FO | 19100 |
November 2010 | 76.6 | Fair | Good | Good | Satisfactory | FO | 19100 |
January 2010 | 76.6 | Fair | Good | Good | Satisfactory | FO | 19100 |
January 2008 | 76.6 | Fair | Good | Good | Satisfactory | FO | 19100 |
January 2006 | 76.6 | Fair | Good | Good | Satisfactory | FO | 19100 |
January 2004 | 76.6 | Fair | Good | Good | Satisfactory | FO | 19100 |
December 2003 | 76.7 | Fair | Good | Good | Satisfactory | FO | 18887 |
January 2002 | 76.7 | Fair | Very Good | Good | Satisfactory | FO | 18887 |
February 2000 | 77.2 | Good | Very Good | Good | Good | - | 14190 |
January 1998 | 77.2 | Good | Very Good | Good | Very Good | - | 14190 |
July 1995 | 77.6 | Good | Excellent | Good | Very Good | - | 14190 |
April 1991 | 42.9 | Poor | Satisfactory | Good | Poor | SD | 14190 |