Share:

FORT AVENUE over CSX

Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:FORT AVENUE over CSX
Structure number:200000BC5405010
Location:0.2 MI. W. OF FT. MCHENRY
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Local (Urban) [19]
Length of largest span:107.0 ft. [32.6 m]
Total length:618.1 ft. [188.4 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:48.2 ft. [14.7 m]
Vertical clearance below bridge:18.0 ft. [5.5 m]
Owner:City or Municipal Highway Agency [04]
Year built:1923
Year reconstructed:1993
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:7
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: January 2017 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:2,755 [as of 2015]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Scour condition:Bridge not over waterway. [N]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:78.7
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$145,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
January 201778.7FairGoodFairFairFO2755
October 201476.6FairGoodFairFairFO11330
October 201275.6FairGoodFairSatisfactoryFO11330
October 201075.6FairGoodFairSatisfactoryFO11330
October 200875.6FairGoodFairSatisfactoryFO11330
July 200676.6FairGoodFairSatisfactoryFO11330
April 200477.6FairGoodFairFairFO11330
March 200277.6FairVery GoodFairFairFO11220
March 200086.0FairVery GoodFairFair--
February 199886.0FairVery GoodFairFair--
January 199148.0PoorPoorFairSatisfactorySD9839