ERDMAN AVE EB over I-895
Map
Coordinates:
+39.30000, -76.5483339°17'60" N, 76°32'54" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.
Facts
Name: | ERDMAN AVE EB over I-895 |
Structure number: | 300000BCY133013 |
Location: | MILEPOST M13.3 |
Purpose: | Carries highway over highway |
Route classification: | Other Principal Arterial (Urban) [14] |
Length of largest span: | 56.1 ft. [17.1 m] |
Total length: | 181.1 ft. [55.2 m] |
Roadway width between curbs: | 42.0 ft. [12.8 m] |
Deck width edge-to-edge: | 48.9 ft. [14.9 m] |
Vertical clearance below bridge: | 14.1 ft. [4.3 m] |
Skew angle: | 99° |
Owner: | State Toll Authority [31] |
Year built: | 1957 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Number of main spans: | 4 |
Main spans material: | Steel [3] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: January 2016
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 11,790 [as of 2016] |
Truck traffic: | 5% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Equal to present minimum criteria [6] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Underclearances appraisal: | Basically intolerable requiring high priority of replacement [2] |
Roadway alignment appraisal: | Better than present minimum criteria [7] |
Scour condition: | Bridge not over waterway. [N] |
Operating rating: | 76.8 tons [69.8 metric tons] |
Inventory rating: | 45.9 tons [41.7 metric tons] |
Sufficiency rating: | 75.5 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $1,417,000 |
Previous Inspections
Date | Suff. Rating | Condition | Deck | Superstructure | Substructure | SD/FO | ADT |
---|
January 2016 | 75.5 | Fair | Satisfactory | Satisfactory | Satisfactory | FO | 11790 |
January 2014 | 74.8 | Fair | Satisfactory | Satisfactory | Satisfactory | FO | 11790 |
May 2012 | 71.7 | Fair | Satisfactory | Satisfactory | Satisfactory | FO | 40950 |
April 2010 | 71.7 | Fair | Satisfactory | Satisfactory | Satisfactory | FO | 40950 |
March 2009 | 71.7 | Fair | Satisfactory | Satisfactory | Satisfactory | FO | 40950 |
May 2008 | 73.9 | Fair | Satisfactory | Satisfactory | Satisfactory | FO | 40950 |
March 2007 | 73.9 | Fair | Satisfactory | Satisfactory | Satisfactory | FO | 40950 |
February 2006 | 73.9 | Fair | Satisfactory | Satisfactory | Satisfactory | FO | 40950 |
February 2005 | 73.9 | Fair | Satisfactory | Satisfactory | Satisfactory | FO | 40950 |
March 2004 | 73.9 | Fair | Satisfactory | Satisfactory | Satisfactory | FO | 40950 |
March 2003 | 73.9 | Fair | Satisfactory | Satisfactory | Satisfactory | FO | 40950 |
April 2002 | 73.9 | Fair | Satisfactory | Satisfactory | Satisfactory | FO | 40950 |
April 2001 | 75.4 | Fair | Satisfactory | Good | Satisfactory | FO | 28574 |
April 2000 | 75.4 | Fair | Satisfactory | Good | Satisfactory | FO | 28574 |
March 1998 | 75.4 | Fair | Satisfactory | Good | Satisfactory | FO | 28574 |
March 1996 | 73.4 | Fair | Satisfactory | Good | Satisfactory | FO | 28574 |
February 1994 | 74.2 | Good | Good | Good | Good | FO | 28574 |
January 1992 | 74.2 | Good | Very Good | Good | Good | FO | 28574 |