IN PERU = N. MAIN over ANDROSCOGGIN RIVER
Map
Coordinates:
+44.53000, -70.4642044°31'48" N, 70°27'51" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | IN PERU = N. MAIN over ANDROSCOGGIN RIVER |
Structure number: | 2019 |
Location: | 150 FT S'LY OF JCT US2 |
Purpose: | Carries highway and pedestrian walkway over waterway |
Route classification: | Minor Arterial (Rural) [06] |
Length of largest span: | 230.0 ft. [70.1 m] |
Total length: | 600.1 ft. [182.9 m] |
Roadway width between curbs: | 22.0 ft. [6.7 m] |
Deck width edge-to-edge: | 43.3 ft. [13.2 m] |
Owner: | State Highway Agency [01] |
Year built: | 2018 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Number of main spans: | 3 |
Main spans material: | Steel [3] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: October 2015
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 5,270 [as of 2014] |
Truck traffic: | 9% of total traffic |
Deck condition: | Fair [5 out of 9] |
Superstructure condition: | Poor [4 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of replacement [2] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 6.0 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $999,999,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
October 2015 | Poor | Fair | Poor | Fair | 5270 | 6.0 |
August 2014 | Poor | Fair | Poor | Fair | 5918 | 6.0 |
December 2013 | Poor | Fair | Poor | Fair | 5819 | 6.0 |
August 2012 | Poor | Fair | Poor | Fair | 5819 | 6.0 |
August 2010 | Poor | Fair | Poor | Satisfactory | 6442 | 11.4 |
December 2009 | Poor | Fair | Poor | Satisfactory | 6366 | 11.4 |
August 2007 | Poor | Fair | Poor | Satisfactory | 5321 | 11.4 |
June 2005 | Fair | Fair | Satisfactory | Satisfactory | 5794 | 43.1 |
September 2003 | Fair | Fair | Good | Satisfactory | 5692 | 43.0 |
June 2001 | Fair | Fair | Good | Fair | 5314 | 30.6 |
October 1999 | Fair | Satisfactory | Good | Fair | 5236 | 32.2 |
September 1997 | Fair | Good | Good | Satisfactory | 5087 | 42.7 |
August 1995 | Fair | Good | Good | Satisfactory | 4943 | 45.4 |
January 1994 | Fair | Good | Satisfactory | Satisfactory | 4633 | 48.1 |
November 1991 | Fair | Good | Satisfactory | Satisfactory | 4663 | 57.5 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Steel Girder/Beam | linear ft. | 3,000 | 3,000 | 0 | 0 | 0 |
Deck |
Reinforced Concrete Deck | sq. ft. | 25,950 | 25,950 | 0 | 0 | 0 |
Substructure |
Reinforced Concrete Pier Wall | linear ft. | 88 | 88 | 0 | 0 | 0 |
Reinforced Concrete Abutment | linear ft. | 89 | 89 | 0 | 0 | 0 |
Joints |
Open Joint | linear ft. | 87 | 87 | 0 | 0 | 0 |
Bearings |
Elastomeric Bearing | each | 20 | 20 | 0 | 0 | 0 |
Bridge Rail |
Steel or Aluminum Bridge Rail | linear ft. | 1,200 | 1,200 | 0 | 0 | 0 |