SCHUBERT HIGHWAY over MONAGHAN CREEK

Map

Coordinates:
+45.23839, -83.53806
45°14'18" N, 83°32'17" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SCHUBERT HIGHWAY over MONAGHAN CREEK
Structure number:000000000008987
Old structure number:71200030000B010 (from 1992 edition)
Location:SEC 23 T33N R7E
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:6.2 ft. [1.9 m]
Total length:21.0 ft. [6.4 m]
Roadway width between curbs:24.9 ft. [7.6 m]
Deck width edge-to-edge:33.1 ft. [10.1 m]
Owner:County Highway Agency [02]
Year built:1960
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: June 2017

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:302 [as of 2014]
Truck traffic:5% of total traffic
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting. [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:76.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$694,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
June 2017Fair5 out of 1030276.9
June 2015Fair5 out of 1030276.9
June 2013Fair5 out of 1030271.9
May 2011Fair5 out of 1042562.9
May 2009Fair5 out of 1042562.9