Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | CR 91 over BUFFALO RIVER |
Structure number: | 1815 |
Location: | 0.5 MI E OF JCT CSAH 11 |
Purpose: | Carries highway over waterway |
Route classification: | Minor Collector (Rural) [08] |
Length of largest span: | 90.6 ft. [27.6 m] |
Total length: | 216.9 ft. [66.1 m] |
Roadway width between curbs: | 17.1 ft. [5.2 m] |
Deck width edge-to-edge: | 18.0 ft. [5.5 m] |
Vertical clearance above deck: | 15.4 ft. [4.7 m] |
Owner: | County Highway Agency [02] |
Year built: | 1915 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 18 / H 20 [4] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: September 2009
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 90 [as of 2005] |
Deck condition: | Poor [4 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Serious [3 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of replacement [2] |
Deck geometry appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Water adequacy appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 24.1 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $598,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
September 2009 | Poor | Poor | Fair | Serious | 90 | 24.1 |
October 1999 | Poor | Fair | Fair | Poor | 85 | 37.7 |
September 1991 | Poor | Satisfactory | Fair | Poor | 65 | 36.5 |