Share:

TH 62 over 28th Ave S

Map

Coordinates:
+44.89739, -93.23239
44°53'51" N, 93°13'57" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:TH 62 over 28th Ave S
Structure number:27521
Location:0.7 MI E OF JCT TH 77
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:67.6 ft. [20.6 m]
Total length:127.0 ft. [38.7 m]
Roadway width between curbs:59.7 ft. [18.2 m]
Deck width edge-to-edge:65.6 ft. [20.0 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: August 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:63,000 [as of 2004]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Scour condition:Bridge not over waterway. [N]
Operating rating:57.6 tons [52.4 metric tons]
Inventory rating:34.5 tons [31.4 metric tons]
Sufficiency rating:90.7
Estimated cost of work:$612,000,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
August 201690.7GoodGoodGoodGood-63000
August 201490.7GoodGoodGoodGood-63000
August 201290.7GoodGoodGoodGood-63000
September 201090.7GoodGoodGoodGood-63000
October 200891.0GoodGoodGoodGood-63000
November 200791.0GoodGoodGoodGood-63000
June 200691.0FairGoodSatisfactoryGood-63000
August 200591.0FairGoodSatisfactoryGood-63000
June 200391.0FairSatisfactorySatisfactoryGood-55000
November 200191.0FairSatisfactorySatisfactoryGood-56000
December 200092.0FairGoodSatisfactoryGood-56000
November 199992.0FairGoodSatisfactoryGood-56000
June 199892.0FairGoodSatisfactoryGood-56000
October 199691.0GoodGoodGoodGood-56000
October 199587.2GoodGoodGoodGoodFO37000
October 199487.2GoodGoodGoodGoodFO47500
May 199389.2GoodGoodGoodGood-47500
August 199289.2GoodGoodGoodVery Good-47500
July 199183.7GoodGoodGoodVery Good-47500