NETTLE TRAIL over N BLACKBIRD CR
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+40.44081, -92.8442540°26'27" N, 92°50'39" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | NETTLE TRAIL over N BLACKBIRD CR |
Structure number: | 20260 |
Old structure number: | 2530015 086 (from 1992 edition) |
Location: | S 18 T 65 N R 17 W |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 47.9 ft. [14.6 m] |
Total length: | 110.9 ft. [33.8 m] |
Roadway width between curbs: | 11.5 ft. [3.5 m] |
Deck width edge-to-edge: | 12.1 ft. [3.7 m] |
Owner: | County Highway Agency [02] |
Year built: | 1909 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Wood or Timber [7] |
Latest Available Inspection: March 2015
Good/Fair/Poor Condition: | Fair |
Status: | Bridge closed to all traffic [K] |
Average daily traffic: | 5 [as of 2013] |
Truck traffic: | 10% of total traffic |
Deck condition: | Fair [5 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Deck geometry appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Water adequacy appraisal: | Better than present minimum criteria [7] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 21.0 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $469,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
March 2015 | Fair | Fair | Fair | Fair | 5 | 21.0 |
March 2013 | Fair | Fair | Fair | Fair | 5 | 21.0 |
December 2008 | Fair | Fair | Fair | Fair | 5 | 21.0 |
January 2007 | Fair | Fair | Fair | Fair | 5 | 21.0 |
February 2005 | Fair | Fair | Fair | Fair | 5 | 21.0 |
March 2003 | Fair | Fair | Fair | Fair | 5 | 21.0 |
January 2001 | Fair | Fair | Fair | Fair | 5 | 21.0 |
March 1999 | Fair | Fair | Fair | Fair | 5 | 21.0 |
February 1991 | Fair | Very Good | Fair | Satisfactory | 5 | 22.0 |