Share:

COUNTY RD 167 over TURNBACK CR

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+37.33192, -93.77989
37°19'55" N, 93°46'48" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:COUNTY RD 167 over TURNBACK CR
Structure number:23633
Location:S 7 T 30 N R 26 W
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:74.2 ft. [22.6 m]
Total length:77.1 ft. [23.5 m]
Roadway width between curbs:13.8 ft. [4.2 m]
Deck width edge-to-edge:13.8 ft. [4.2 m]
Owner:County Highway Agency [02]
Year built:1910
Historic significance:Historical significance is not determinable at this time [4]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

Latest Available Inspection: November 2009

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:25 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:19.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$349,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
November 2009PoorGoodPoorSatisfactory2519.9
February 2008PoorGoodPoorSatisfactory2522.9
January 2006PoorGoodPoorSatisfactory2522.9
February 2004PoorVery GoodPoorSatisfactory2523.9
March 2002PoorVery GoodPoorSatisfactory2523.9
April 2000PoorVery GoodPoorSatisfactory2523.9