1002 over MULBERRY CR

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+38.23934, -94.54131
38°14'22" N, 94°32'29" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:1002 over MULBERRY CR
Structure number:23827
Old structure number:4350021 007 (from 1992 edition)
Location:S 26 T 40 N R 33 W
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:60.0 ft. [18.3 m]
Total length:91.9 ft. [28.0 m]
Roadway width between curbs:11.8 ft. [3.6 m]
Deck width edge-to-edge:11.8 ft. [3.6 m]
Owner:County Highway Agency [02]
Year reconstructed:1935
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]

Latest Available Inspection: January 2013

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:5 [as of 2011]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:20.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$402,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
January 2013PoorFairSeriousGood520.0
January 2011PoorFairPoorGood516.9
February 2009PoorFairPoorGood519.0
March 2007FairFairFairGood519.0
March 2005FairFairFairGood519.0
April 2003FairSatisfactoryFairGood1020.0
January 2001FairGoodSatisfactoryGood1022.3
May 1999FairGoodSatisfactoryGood1022.3
March 1991FairGoodSatisfactoryGood1024.7