Share:

ANTIOCH RD over ROCK CR

Map 

Coordinates:
+39.15614, -94.54734
39°09'22" N, 94°32'50" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:ANTIOCH RD over ROCK CR
Structure number:25315
Old structure number:N024B22 024 (from 1992 edition)
Location:S 7 T 50 N R 32 W
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:27.9 ft. [8.5 m]
Total length:28.9 ft. [8.8 m]
Roadway width between curbs:19.0 ft. [5.8 m]
Deck width edge-to-edge:21.7 ft. [6.6 m]
Owner:City or Municipal Highway Agency [04]
Year built:1920
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: March 2016 

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:1,908 [as of 2016]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:19.8 tons [18.0 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Sufficiency rating:26.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$242,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
March 201626.5PoorFairPoorFairSD1908
March 201426.5PoorFairPoorFairSD1908
April 201226.5PoorFairPoorFairSD1908
March 201041.5FairFairFairFairFO4130
March 200841.5FairFairFairFairFO4130
January 200641.5FairFairFairFairFO4130
March 200439.3FairFairFairFairSD5200
June 200239.3FairFairFairFairSD5200
June 200039.3FairFairFairFairSD5200
May 199842.0FairFairFairFairFO500
October 199041.7FairSatisfactorySatisfactorySatisfactorySD22930