Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:BLUE RIDGE CUT OFF over ROUND GROVE CR
Structure number:25454
Old structure number:S085B21 048 (from 1992 edition)
Location:S 29 T 49 N R 32 W
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:9.8 ft. [3.0 m]
Total length:21.0 ft. [6.4 m]
Roadway width between curbs:68.6 ft. [20.9 m]
Deck width edge-to-edge:128.0 ft. [39.0 m]
Skew angle:10°
Owner:City or Municipal Highway Agency [04]
Year built:1960
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Culvert [19]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: April 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:12,012 [as of 2016]
Truck traffic:3% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:72.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$127,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
April 2016Good7 out of 101201272.3
April 2014Good7 out of 101201272.3
March 2012Good7 out of 101201272.3
April 2010Good7 out of 101570071.6
March 2008Good7 out of 101570071.6
February 2006Good7 out of 101570071.6
March 2004Good7 out of 101570071.6
June 2002Good7 out of 101861171.0
July 2000Good7 out of 101861171.0
May 1998Good7 out of 102000070.7
June 1996Good7 out of 102000070.7
October 1994Good7 out of 102000070.4
November 1992Good7 out of 102000077.1