GREGORY BLVD over UP RR, BIG BLUE RVR

Map

Coordinates:
+38.99687, -94.52977
38°59'49" N, 94°31'47" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:GREGORY BLVD over UP RR, BIG BLUE RVR
Structure number:25478
Old structure number:U2220S121B21 (from 1992 edition)
Location:S 11 T 48 N R 33 W
Purpose:Carries highway over railroad and waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:140.1 ft. [42.7 m]
Total length:700.2 ft. [213.4 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:59.7 ft. [18.2 m]
Vertical clearance below bridge:32.8 ft. [10.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:1917
Year reconstructed:1984
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:7
Main spans material:Concrete continuous [2]
Main spans design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: March 2016

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:11,411 [as of 2014]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:32.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$8,187,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
March 2016PoorGoodPoorPoor1141132.5
April 2014PoorGoodPoorPoor1141132.5
April 2012PoorGoodPoorPoor1141132.5
April 2010FairGoodFairFair1141149.2
June 2008FairGoodFairFair1141152.2
March 2006FairGoodFairFair1141152.2
March 2004FairGoodFairFair1141152.2
July 2002PoorGoodFairPoor1141132.5
July 2000FairGoodFairSatisfactory1141152.2
July 1998FairGoodFairFair1000052.9
September 1990GoodGoodGoodVery Good908052.3