COUNTY RD 536 over ELK CR
Map
Coordinates:
+39.72125, -93.0963339°43'16" N, 93°05'47" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | COUNTY RD 536 over ELK CR |
Structure number: | 28850 |
Old structure number: | 5360002 058 (from 1992 edition) |
Location: | S 25 T 57 N R 20 W |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 31.5 ft. [9.6 m] |
Total length: | 49.9 ft. [15.2 m] |
Roadway width between curbs: | 12.1 ft. [3.7 m] |
Deck width edge-to-edge: | 12.8 ft. [3.9 m] |
Owner: | County Highway Agency [02] |
Year built: | 1920 |
Year reconstructed: | 2003 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Number of main spans: | 2 |
Main spans material: | Steel [3] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Wood or Timber [7] |
Latest Available Inspection: November 2018
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 5 [as of 2016] |
Truck traffic: | 10% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Poor [4 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of replacement [2] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 19.4 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $239,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
November 2018 | Poor | Satisfactory | Fair | Poor | 5 | 19.4 |
November 2016 | Poor | Satisfactory | Satisfactory | Poor | 5 | 19.4 |
January 2015 | Poor | Satisfactory | Satisfactory | Poor | 5 | 19.4 |
January 2013 | Fair | Good | Good | Satisfactory | 5 | 40.1 |
January 2011 | Fair | Good | Good | Satisfactory | 5 | 38.0 |
March 2009 | Fair | Good | Good | Satisfactory | 5 | 38.0 |
March 2007 | Good | Good | Good | Good | 5 | 38.0 |
January 2005 | Fair | Very Good | Good | Satisfactory | 5 | 38.2 |
February 2003 | Poor | Satisfactory | Critical | Fair | 5 | 20.0 |
June 2001 | Fair | Excellent | Satisfactory | Satisfactory | 5 | 29.3 |
March 1999 | Poor | Good | Poor | Satisfactory | 5 | 20.0 |
September 1997 | Fair | Excellent | Satisfactory | Satisfactory | 5 | 29.3 |