US 69 N over MISSOURI RVR, US 69, UP
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+39.15754, -94.6240039°09'27" N, 94°37'26" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | US 69 N over MISSOURI RVR, US 69, UP |
Structure number: | 300 |
Old structure number: | A 450R1 3 (from 1992 edition) |
Location: | S 8 T 50 N R 33 W |
Purpose: | Carries highway over highway, waterway, and railroad |
Route classification: | Other Principal Arterial (Urban) [14] |
Length of largest span: | 474.8 ft. [144.7 m] |
Total length: | 2602.2 ft. [793.1 m] |
Roadway width between curbs: | 25.9 ft. [7.9 m] |
Deck width edge-to-edge: | 28.9 ft. [8.8 m] |
Vertical clearance above deck: | 15.4 ft. [4.7 m] |
Vertical clearance below bridge: | 55.8 ft. [17.0 m] |
Owner: | State Highway Agency [01] |
Year built: | 1957 |
Year reconstructed: | 1997 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Number of main spans: | 5 |
Main spans material: | Steel continuous [4] |
Main spans design: | Truss - Thru [10] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: July 2014
Good/Fair/Poor Condition: | Fair |
Status: | Posted for load [P] |
Average daily traffic: | 12,410 [as of 2014] |
Truck traffic: | 13% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Deck geometry appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Underclearances appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Better than present minimum criteria [7] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Pier/abutment protection: | In place and functioning [2] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 44.2 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $50,081,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
July 2014 | Fair | Good | Fair | Fair | 12410 | 44.2 |
August 2013 | Fair | Good | Fair | Fair | 7010 | 44.9 |
August 2011 | Fair | Good | Fair | Fair | 7153 | 44.9 |
November 2009 | Fair | Good | Fair | Fair | 7173 | 42.4 |
January 2009 | Fair | Very Good | Fair | Fair | 7173 | 42.4 |
January 2006 | Fair | Very Good | Satisfactory | Fair | 7526 | 42.3 |
April 2003 | Fair | Very Good | Satisfactory | Fair | 7702 | 42.3 |
June 2000 | Fair | Very Good | Satisfactory | Fair | 7558 | 44.4 |
May 1999 | Fair | Very Good | Satisfactory | Fair | 3898 | 44.8 |
May 1998 | Fair | Very Good | Satisfactory | Fair | 3898 | 44.8 |