MO 30 E over RIVER DES PERES

Map

Coordinates:
+38.56354, -90.29532
38°33'49" N, 90°17'43" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:MO 30 E over RIVER DES PERES
Structure number:30665
Old structure number:U387510005 115 (from 1992 edition)
Location:S 12 T 44 N R 6 E
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:85.0 ft. [25.9 m]
Total length:223.1 ft. [68.0 m]
Roadway width between curbs:67.9 ft. [20.7 m]
Deck width edge-to-edge:80.1 ft. [24.4 m]
Owner:State Highway Agency [01]
Year built:1980
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: August 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:17,985 [as of 2016]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:78.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,224,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
August 2017FairSatisfactorySatisfactoryGood1798578.8
August 2015FairSatisfactoryGoodVery Good1787878.8
August 2013FairSatisfactoryVery GoodVery Good1994078.6
August 2011FairSatisfactoryVery GoodVery Good1772178.9
September 2009FairSatisfactoryVery GoodVery Good1558679.1
September 2007FairSatisfactoryVery GoodVery Good2597077.9
September 2005FairSatisfactoryVery GoodGood1705978.9
April 2003GoodGoodVery GoodVery Good1730278.9
June 1999GoodGoodVery GoodVery Good2597077.9
June 1991GoodVery GoodVery GoodVery Good2578978.5

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Prestressed Concrete Girder/Beamlinear ft.2,1361,425701100
Deck
Reinforced Concrete Decksq. ft.18,047017,0739740
Substructure
Reinforced Concrete Columneach87100
Reinforced Concrete Abutmentlinear ft.25822611210
Reinforced Concrete Pier Caplinear ft.1561461000
Bearings
Enclosed/Concealed Bearingeach6060000
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.4510441100