Share:

US 67 S over ST FRANCIS RVR

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+37.09616, -90.45427
37°05'46" N, 90°27'15" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:US 67 S over ST FRANCIS RVR
Structure number:5216
Old structure number:J 21R 1 (from 1992 edition)
Location:S 13 T 28 N R 5 E
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other (Rural) [02]
Length of largest span:170.6 ft. [52.0 m]
Total length:851.1 ft. [259.4 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:28.2 ft. [8.6 m]
Vertical clearance above deck:14.8 ft. [4.5 m]
Owner:State Highway Agency [01]
Year built:1930
Year reconstructed:1940
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: December 2009

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:4,620 [as of 2009]
Truck traffic:20% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:39.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$6,841,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
December 2009FairFairSatisfactoryFair462039.8
December 1999FairFairSatisfactoryFair537935.2
November 1991FairFairSatisfactorySatisfactory529743.2