Share:

US 61 S over GABOURI CR

Map

Coordinates:
+37.97879, -90.09597
37°58'44" N, 90°05'45" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:US 61 S over GABOURI CR
Structure number:5230
Old structure number:J 63R 1 (from 1992 edition)
Location:S 24 T 38 N R 8 E
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:37.4 ft. [11.4 m]
Total length:75.1 ft. [22.9 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:29.9 ft. [9.1 m]
Skew angle:45°
Owner:State Highway Agency [01]
Year built:1929
Year reconstructed:1940
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: October 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:4,430 [as of 2017]
Truck traffic:15% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:46.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$587,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2018FairFairFairFair443046.5
October 2016FairFairFairFair434046.6
October 2014FairFairFairFair423846.8
October 2012FairFairFairFair441446.5
October 2010FairFairFairFair425047.7
December 2008FairFairFairFair438647.5
October 2006FairFairFairFair457047.1
November 2004FairFairFairFair491446.5
December 2002FairFairFairFair489846.5
December 2001FairFairFairFair492248.9
December 1999FairFairFairFair470345.9
November 1998FairFairFairFair470345.9
December 1997FairFairFairFair470345.9
December 1995FairSatisfactorySatisfactorySatisfactory255564.1
November 1993FairSatisfactorySatisfactorySatisfactory374358.3
November 1991FairSatisfactorySatisfactorySatisfactory352858.7