Share:

SP 240 E over MONITEAU CREEK

Map

Coordinates:
+38.98133, -92.56647
38°58'53" N, 92°33'59" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SP 240 E over MONITEAU CREEK
Structure number:5969
Old structure number:K 857R 1 (from 1992 edition)
Location:S 1 T 48 N R 15 W
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:85.0 ft. [25.9 m]
Total length:272.0 ft. [82.9 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:29.5 ft. [9.0 m]
Skew angle:26°
Owner:State Highway Agency [01]
Year built:1963
Year reconstructed:1968
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: September 2017

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:308 [as of 2016]
Truck traffic:19% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:48.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,427,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2017PoorPoorPoorFair30848.0
September 2015PoorPoorGoodFair37048.4
September 2013FairFairGoodFair36850.4
September 2011FairFairGoodSatisfactory37260.5
November 2009FairFairGoodSatisfactory40261.4
October 2007FairSatisfactoryGoodGood38463.4
January 2007FairSatisfactoryGoodGood38263.4
October 2005FairSatisfactoryGoodGood38263.4
December 2004FairSatisfactoryGoodGood57463.2
October 2003FairSatisfactoryGoodGood57663.2
February 2003FairSatisfactoryGoodGood379647.0
October 2001FairSatisfactoryGoodGood381547.0
November 1999FairSatisfactoryGoodGood188653.3
November 1998FairSatisfactoryGoodGood188653.3
September 1997FairSatisfactoryVery GoodGood188651.3
November 1995FairSatisfactorySatisfactoryGood176451.4
March 1995FairSatisfactorySatisfactoryGood169651.5
November 1993FairSatisfactorySatisfactoryGood164051.6
October 1992FairSatisfactorySatisfactoryGood164052.6
October 1991FairSatisfactorySatisfactoryGood158652.6