Share:

MO 43 S over BOILING SPRINGS BR

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+36.81540, -94.61103
36°48'55" N, 94°36'40" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:MO 43 S over BOILING SPRINGS BR
Structure number:6016
Location:S 16 T 24 N R 34 W
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:37.4 ft. [11.4 m]
Total length:86.0 ft. [26.2 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:26.2 ft. [8.0 m]
Owner:State Highway Agency [01]
Year built:1941
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: December 2009

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:1,678 [as of 2008]
Truck traffic:18% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:40.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$600,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
December 2009PoorPoorFairSatisfactory167840.6