Share:

RT BB S over CROOKED RVR

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+39.48261, -94.08548
39°28'57" N, 94°05'08" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:RT BB S over CROOKED RVR
Structure number:7067
Old structure number:N 525 1 (from 1992 edition)
Location:S 18 T 54 N R 28 W
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:40.4 ft. [12.3 m]
Total length:109.9 ft. [33.5 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:22.3 ft. [6.8 m]
Skew angle:15°
Owner:State Highway Agency [01]
Year built:1958
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 9 / H 10 [1]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Channel beam [22]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: October 2009

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:200 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:7.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$645,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2009PoorPoorPoorFair2007.5
November 1999PoorPoorPoorFair8533.9
September 1991PoorPoorPoorSatisfactory1089.6