Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:MO 151 S over OTTER CR
Structure number:9592
Old structure number:X 211 1 (from 1992 edition)
Location:S 8 T 56 N R 12 W
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:49.2 ft. [15.0 m]
Total length:112.9 ft. [34.4 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:24.0 ft. [7.3 m]
Owner:State Highway Agency [01]
Year built:1937
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 9 / H 10 [1]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: October 2009

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:732 [as of 2008]
Truck traffic:23% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:32.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$735,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2009PoorPoorSatisfactoryFair73232.5
November 1999PoorPoorSatisfactoryFair59632.6
December 1991FairFairVery GoodFair30337.5