Share:

RT B S over CROOKED RVR

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+38.43654, -93.93880
38°26'12" N, 93°56'20" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:RT B S over CROOKED RVR
Structure number:9839
Old structure number:X 858 1 (from 1992 edition)
Location:S 4 T 53 N R 27 W
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:59.1 ft. [18.0 m]
Total length:201.1 ft. [61.3 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:22.3 ft. [6.8 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1949
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 9 / H 10 [1]
Number of main spans:5
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: September 2009

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:198 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Serious [3 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:12.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,104,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2009PoorSeriousFairSerious19812.9
November 1999PoorSeriousGoodFair23722.2
September 1991PoorPoorGoodFair17526.6