Share:

GATESVILLE RD over PEARL RIVER

Map

Coordinates:
+31.99624, -90.22423
31°59'46" N, 90°13'27" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:GATESVILLE RD over PEARL RIVER
Structure number:SA1500000000050
Location:SEC 20 T 2N R 1E B
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:174.9 ft. [53.3 m]
Total length:1345.2 ft. [410.0 m]
Roadway width between curbs:32.2 ft. [9.8 m]
Deck width edge-to-edge:35.4 ft. [10.8 m]
Owner:County Highway Agency [02]
Year built:1997
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: October 2015

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:400 [as of 2013]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Better than present minimum criteria [7]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:65.3 tons [59.4 metric tons]
Inventory rating:17.3 tons [15.7 metric tons]
Sufficiency rating:74.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$6,974,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
October 201574.9FairGoodGoodSatisfactory-400
October 201374.9GoodGoodGoodGood-400
October 201199.4GoodVery GoodVery GoodVery Good-400
November 201099.4GoodVery GoodVery GoodVery Good-400
October 200999.4GoodVery GoodVery GoodVery Good-400
October 200799.4GoodVery GoodVery GoodVery Good-400
December 200599.4GoodVery GoodVery GoodVery Good-400
January 200499.4GoodVery GoodVery GoodVery Good-400
December 200199.4GoodExcellentExcellentExcellent-400
December 199999.5GoodExcellentExcellentExcellent-360
February 199899.5GoodExcellentExcellentExcellent-360
February 19972.0----SD350