Facts 

Name:MCCLUER RD over TRIB&RELIEF CANEY CR
Structure number:SA2500000000157
Location:SEC 30 T 5N R 1E
Purpose:Carries highway over relief for waterway
Route classification:Collector (Urban) [17]
Length of largest span:19.0 ft. [5.8 m]
Total length:38.1 ft. [11.6 m]
Roadway width between curbs:23.3 ft. [7.1 m]
Deck width edge-to-edge:24.6 ft. [7.5 m]
Owner:City or Municipal Highway Agency [04]
Year built:1996
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 9 / H 10 [1]
Number of main spans:2
Main spans material:Wood or timber [7]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Wood or Timber [8]
Wearing surface:Bituminous [6]

Latest Available Inspection: February 2017 

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:4,900 [as of 2015]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:15.7 tons [14.3 metric tons]
Inventory rating:10.2 tons [9.3 metric tons]
Sufficiency rating:36.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$156,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
February 201736.3FairGoodGoodSatisfactorySD4900
February 201636.3FairGoodGoodSatisfactorySD4900
February 201536.3FairGoodGoodSatisfactorySD4900
February 201436.3FairGoodGoodSatisfactorySD4900
February 201335.5FairGoodGoodSatisfactorySD4900
February 201235.5FairGoodGoodSatisfactorySD4900
February 201135.5FairGoodGoodSatisfactorySD4900
February 201035.5GoodGoodGoodGoodSD4900
January 200935.5GoodGoodGoodGoodSD4900
November 200735.5GoodGoodGoodGoodSD4900
January 200735.5GoodGoodGoodGoodSD4900
December 200535.5GoodGoodGoodGoodSD4900
January 200535.5GoodGoodGoodGood-4900
February 200435.5GoodGoodGoodGood-4900
January 200235.5GoodVery GoodVery GoodVery Good-4900
December 200035.5GoodVery GoodVery GoodVery Good-4900
February 200035.5GoodVery GoodVery GoodVery Good-4900
February 199935.5GoodVery GoodVery GoodVery Good-4900
March 199834.3GoodVery GoodVery GoodVery Good-4900
April 19964.0PoorFairFairSeriousSD4900