Share:

CAVALIER DR over BCH EUBANKS CR

Map 

Coordinates:
+32.34062, -90.16450
32°20'26" N, 90°09'52" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:CAVALIER DR over BCH EUBANKS CR
Structure number:SA2500000000236
Location:SEC 26 T 6N R 1E
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:25.9 ft. [7.9 m]
Total length:25.9 ft. [7.9 m]
Roadway width between curbs:37.4 ft. [11.4 m]
Deck width edge-to-edge:38.1 ft. [11.6 m]
Skew angle:60°
Owner:City or Municipal Highway Agency [04]
Year built:1991
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 9 / H 10 [1]
Main span material:Wood or timber [7]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Wood or Timber [8]
Wearing surface:Bituminous [6]

Latest Available Inspection: February 2017 

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:240 [as of 2015]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:8.6 tons [7.8 metric tons]
Inventory rating:5.5 tons [5.0 metric tons]
Sufficiency rating:38.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$127,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
February 201738.9FairSatisfactorySatisfactoryFairSD240
February 201638.9FairSatisfactorySatisfactoryFairSD240
February 201538.9FairSatisfactorySatisfactoryFairSD240
February 201438.9FairSatisfactorySatisfactoryFairSD240
February 201338.9FairSatisfactorySatisfactoryFairSD240
February 201238.9FairSatisfactorySatisfactoryFairSD240
February 201138.9FairSatisfactoryGoodFairSD240
February 201038.9FairSatisfactoryGoodFairSD240
January 200939.9PoorSatisfactoryGoodPoorSD240
November 200739.9PoorSatisfactoryGoodPoorSD240
January 200739.9PoorSatisfactoryGoodPoorSD240
December 200539.9PoorSatisfactoryGoodPoorSD240
December 200436.9PoorSatisfactoryGoodPoorSD240
February 200436.9PoorSatisfactoryGoodPoorSD240
February 200236.9FairSatisfactoryGoodFairSD240
December 200045.3FairSatisfactoryGoodSatisfactorySD220
February 200045.3FairGoodGoodSatisfactory-220
February 199945.3FairGoodGoodSatisfactory-220
March 199846.3FairGoodGoodSatisfactory-220
April 199646.3GoodVery GoodVery GoodGood-220