Facts

Name:READY MIX STREET over TRIB TO TOWN CREEK
Structure number:SA2500000000241
Location:SEC 27 T 6N R 1E
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:23.0 ft. [7.0 m]
Total length:23.0 ft. [7.0 m]
Roadway width between curbs:21.0 ft. [6.4 m]
Deck width edge-to-edge:22.3 ft. [6.8 m]
Owner:City or Municipal Highway Agency [04]
Year built:1996
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Wood or timber [7]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

Latest Available Inspection: February 2017

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:110 [as of 2015]
Truck traffic:80% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:26.8 tons [24.4 metric tons]
Inventory rating:19.4 tons [17.6 metric tons]
Sufficiency rating:63.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$73,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
February 201763.5PoorPoorGoodGoodSD110
February 201666.5FairSatisfactoryGoodGood-110
February 201565.5GoodVery GoodGoodGood-110
February 201465.5GoodVery GoodGoodGood-110
February 201365.5GoodVery GoodGoodGood-110
February 201257.0FairSatisfactorySatisfactoryGood-110
February 201165.5FairSatisfactorySatisfactoryGood-110
February 201065.5FairSatisfactorySatisfactoryGood-110
January 200962.5FairSatisfactorySatisfactoryGood-110
November 200762.5FairSatisfactorySatisfactoryVery Good-110
January 200761.5FairFairSatisfactoryVery Good-101
December 200561.5FairFairVery GoodVery Good-101
February 200473.5GoodGoodVery GoodVery Good-100
February 200273.5GoodGoodVery GoodVery Good-100
February 200073.5GoodGoodVery GoodVery Good-80
March 199873.5GoodVery GoodVery GoodVery Good-80
April 199640.0PoorFairPoorCriticalSD80