Share:

MORTON RANKIN RD over BCH OF PELAHATCHIE CK

Map 

Coordinates:
+32.35339, -89.68764
32°21'12" N, 89°41'15" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:MORTON RANKIN RD over BCH OF PELAHATCHIE CK
Structure number:SA6200000000033
Location:SEC 21 T 6N R 6E B
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:30.8 ft. [9.4 m]
Total length:68.9 ft. [21.0 m]
Roadway width between curbs:23.3 ft. [7.1 m]
Deck width edge-to-edge:24.6 ft. [7.5 m]
Owner:County Highway Agency [02]
Year built:1986
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Channel beam [22]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: December 2016 

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:200 [as of 2015]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:60.3 tons [54.8 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:91.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$370,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
December 201691.9GoodVery GoodGoodGood-200
December 201489.9GoodVery GoodVery GoodGood-200
December 201282.8GoodVery GoodVery GoodGood-200
January 201169.5GoodVery GoodVery GoodGood-200
December 200969.5GoodVery GoodVery GoodGood-200
January 200869.5GoodVery GoodVery GoodGood-200
September 200569.5GoodVery GoodVery GoodGood-200
December 200369.5GoodVery GoodVery GoodGood-200
December 200169.4GoodVery GoodVery GoodGood-200
December 199969.4GoodVery GoodVery GoodVery Good-200
November 199769.4GoodVery GoodVery GoodVery Good-200
December 199569.4GoodVery GoodVery GoodVery Good-200