Facts 

Name:GUM SPRINGS ROAD over HONTOKALO CREEK
Structure number:SA6200000000141
Location:SEC 33 T 8N R 9E B
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:80.1 ft. [24.4 m]
Total length:160.1 ft. [48.8 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:31.2 ft. [9.5 m]
Owner:County Highway Agency [02]
Year built:2009
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: December 2016 

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:180 [as of 2015]
Truck traffic:8% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Very Good [8 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:63.5 tons [57.7 metric tons]
Inventory rating:30.7 tons [27.9 metric tons]
Sufficiency rating:96.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$600,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
December 201696.8GoodExcellentExcellentVery Good-180
December 201496.8GoodExcellentExcellentVery Good-180
December 201278.9GoodExcellentExcellentExcellent-180
January 201199.9GoodExcellentExcellentExcellent-180
December 200999.9GoodExcellentExcellentExcellent-180
January 200932.4PoorGoodGoodPoorSD320
January 200832.4PoorGoodGoodPoorSD320
December 200632.4PoorGoodGoodPoorSD320
September 200532.4PoorGoodGoodPoorSD320
September 200432.4PoorGoodGoodPoorSD320
March 200432.4PoorGoodGoodPoorSD320
December 200172.4FairGoodGoodSatisfactory-320
December 199976.4GoodVery GoodVery GoodGood-250
November 199776.4GoodVery GoodVery GoodGood-250
December 199576.4GoodVery GoodVery GoodGood-250