Share:

FRONTAGE ROAD 201 over INT MOON CREEK-I 94 005

Map

Coordinates:
+46.31001, -106.03789
46°18'36" N, 106°02'16" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:FRONTAGE ROAD 201 over INT MOON CREEK-I 94 005
Structure number:L09201000+01001
Location:10M SW MILES CITY
Purpose:Carries highway overpass over highway
Route classification:Minor Collector (Rural) [08]
Length of largest span:65.9 ft. [20.1 m]
Total length:240.5 ft. [73.3 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:26.9 ft. [8.2 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:State Highway Agency [01]
Year built:1962
Year reconstructed:1972
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 13.5 / HS 15 [3]
Number of main spans:4
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: November 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:119 [as of 2016]
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:82.3

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
November 2017FairFairGoodGood11982.3
October 2015FairFairGoodGood10087.8
October 2013FairFairGoodGood10087.8
October 2011PoorPoorGoodGood10085.8
November 2009GoodGoodGoodGood10090.8
October 2007GoodGoodVery GoodVery Good10090.8
February 2005GoodVery GoodVery GoodVery Good10090.8
February 2003GoodVery GoodVery GoodVery Good10090.8
January 1999GoodVery GoodVery GoodVery Good10076.0
December 1996GoodVery GoodVery GoodVery Good10076.0
March 1995GoodVery GoodVery GoodVery Good9671.8
December 1992GoodVery GoodVery GoodVery Good9675.8
February 1991GoodVery GoodVery GoodVery Good9684.6

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Prestressed Concrete Girder/Beamlinear ft.942933900
Substructure
Reinforced Concrete Columneach65100
Reinforced Concrete Abutmentlinear ft.7272000
Reinforced Concrete Pier Caplinear ft.7271100
Joints
Compression Jointlinear ft.2602600
Assembly without Seal Jointlinear ft.2621500
Bearings
Movable Bearingeach87100
Steel Protective Coatingsq. ft.1614200
Fixed Bearingeach1614200
Steel Protective Coatingsq. ft.3229300
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.4824344800
Steel Protective Coatingsq. ft.1,9281,73519300