Share:

PEEBLES RD over TETON RIVER 064

Map

Coordinates:
+47.87889, -112.45954
47°52'44" N, 112°27'34" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:PEEBLES RD over TETON RIVER 064
Structure number:L50185004+05001
Location:10M NW CHOTEAU
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:70.9 ft. [21.6 m]
Total length:143.1 ft. [43.6 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:24.0 ft. [7.3 m]
Owner:County Highway Agency [02]
Year built:1973
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Prestressed concrete [5]
Main spans design:Tee beam [04]
Deck type:Not applicable [N]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: December 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:100 [as of 2003]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:91.1

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
December 2017FairGoodGoodSatisfactory10091.1
January 2017FairSatisfactoryGoodSatisfactory10091.1
January 2015FairSatisfactoryGoodFair10081.9
January 2013FairSatisfactoryGoodFair10081.9
February 2011FairGoodGoodSatisfactory10093.1
February 2009FairGoodGoodSatisfactory10093.1
February 2007FairGoodVery GoodSatisfactory10093.1
March 2005GoodGoodVery GoodGood10093.1
February 2003GoodGoodVery GoodGood10093.1
May 2001GoodVery GoodVery GoodGood10093.1
February 1999GoodVery GoodVery GoodGood10091.1
February 1997GoodVery GoodVery GoodGood10091.1
August 1995GoodVery GoodVery GoodGood3191.8
November 1992GoodVery GoodVery GoodGood3190.8
January 1991GoodVery GoodVery GoodGood3190.8

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Prestressed Concrete Girder/Beamlinear ft.5715611000
Deck
Reinforced Concrete Top Flangesq. ft.3,4343,430400
Substructure
Other Material Pier Walllinear ft.2323000
Reinforced Concrete Abutmentlinear ft.10297050
Reinforced Concrete Pier Caplinear ft.2322100
Joints
Pourable Jointlinear ft.2302300
Bearings
Fixed Bearingeach1612400
Steel Protective Coatingsq. ft.1612022
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.285285000
Steel Protective Coatingsq. ft.855855000