Share:

FRONTAGE RD-S 205 over CAMP CREEK

Map

Coordinates:
+45.83940, -111.29894
45°50'22" N, 111°17'56" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:FRONTAGE RD-S 205 over CAMP CREEK
Structure number:S00205012+08751
Location:2M SE MANHATTAN
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:41.0 ft. [12.5 m]
Total length:43.0 ft. [13.1 m]
Roadway width between curbs:27.2 ft. [8.3 m]
Deck width edge-to-edge:31.2 ft. [9.5 m]
Owner:State Highway Agency [01]
Year built:1920
Year reconstructed:1934
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Concrete [1]
Main span design:Tee beam [04]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: April 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:1,644 [as of 2017]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:68.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$120,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
April 2018FairSatisfactoryGoodSatisfactory164468.5
October 2017FairSatisfactoryGoodSatisfactory163468.5
April 2016FairSatisfactorySatisfactorySatisfactory202066.0
May 2014GoodGoodGoodGood247065.4
May 2012GoodGoodGoodGood247064.4
May 2010GoodGoodGoodGood247064.4
April 2008GoodGoodGoodGood205064.9
April 2006GoodGoodGoodGood209064.9
March 2004GoodGoodGoodGood183067.3
March 2002GoodGoodGoodGood183067.3
January 2000GoodGoodGoodGood206064.9
January 1998GoodGoodGoodGood165067.5
February 1996GoodGoodGoodGood118467.1
March 1994GoodGoodGoodGood119466.9
August 1992GoodGoodGoodGood116571.4
February 1990GoodGoodGoodGood107671.5

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Reinforced Concrete Girder/Beamlinear ft.3443123200
Deck
Reinforced Concrete Top Flangesq. ft.1,3451,154145460
Wearing Surfacessq. ft.1,3451,345000
Substructure
Reinforced Concrete Abutmentlinear ft.85701500
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.85602320