COUNTY HIGHWAY over ELM RIVER

Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:COUNTY HIGHWAY over ELM RIVER
Structure number:000000049114240
Location:2 EAST 2 SOUTH BLANCHARD
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:26.9 ft. [8.2 m]
Total length:28.9 ft. [8.8 m]
Roadway width between curbs:22.3 ft. [6.8 m]
Deck width edge-to-edge:22.3 ft. [6.8 m]
Owner:County Highway Agency [02]
Year built:1937
Year reconstructed:1978
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:M 18 / H 20 [4]
Main span material:Wood or timber [7]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

Latest Available Inspection: November 2016 

Good/Fair/Poor Condition:Poor
Status:Bridge closed to all traffic [K]
Average daily traffic:10 [as of 2016]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Sufficiency rating:40.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$72,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
November 201640.0PoorSatisfactoryPoorPoorSD10
November 201440.0PoorSatisfactoryPoorPoorSD10
October 201240.0PoorSatisfactoryPoorPoorSD10
December 201054.5PoorSatisfactoryPoorPoorSD10
December 200854.5PoorSatisfactorySatisfactoryPoorSD10
September 200754.5PoorSatisfactorySatisfactoryPoorSD10
January 200754.5PoorSatisfactorySatisfactoryPoorSD10
January 200554.5PoorSatisfactorySatisfactoryPoorSD10
December 200254.5PoorSatisfactorySatisfactoryPoorSD10
December 200070.4FairSatisfactorySatisfactoryFair-10
December 199870.4FairSatisfactorySatisfactoryFair-10
August 199670.4FairGoodSatisfactoryFair-10
December 199470.4FairGoodSatisfactoryFair-10
December 199270.4FairGoodSatisfactoryFair-10
February 199170.4FairGoodSatisfactoryFair-10