Share:

IRRSR ND HIWAY 24 over FOUR MILE CREEK

Map

Coordinates:
+46.03059, -100.80493
46°01'50" N, 100°48'18" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:IRRSR ND HIWAY 24 over FOUR MILE CREEK
Structure number:0024000320
Location:11 SOUTHWEST FORT YATES
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:48.9 ft. [14.9 m]
Total length:53.2 ft. [16.2 m]
Roadway width between curbs:34.1 ft. [10.4 m]
Deck width edge-to-edge:36.4 ft. [11.1 m]
Owner:State Highway Agency [01]
Year built:1930
Year reconstructed:1963
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: April 2015

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:750 [as of 2015]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:There are no noticeable or noteworthy deficiencies which affect the condition of the channel. [9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:75.0 tons [68.2 metric tons]
Inventory rating:45.0 tons [40.9 metric tons]
Sufficiency rating:86.2
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$65,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
April 201586.2FairGoodGoodFair-750
May 201369.8PoorGoodGoodPoorSD750
November 201163.3FairGoodGoodFair-750
November 200963.3FairGoodGoodFair-750
November 200773.7FairGoodGoodSatisfactory-750
November 200573.7FairGoodGoodSatisfactory-750
January 200473.7FairGoodGoodSatisfactory-750
January 200273.7FairGoodGoodSatisfactory-750
March 200073.7GoodGoodGoodGood-750
January 199873.3GoodGoodGoodGood-900
February 199673.0GoodGoodGoodGood-983
February 199475.6GoodGoodGoodGood-420
March 199274.3GoodGoodGoodGood-519

Element Data

Source: National Bridge Elements dataset, 2016 edition. This feature is experimental.
ElementUnitsQuantity1. Good2. Fair3. Poor4. Serious
Superstructure
Steel Girder/Beamlinear ft.3053278240
Steel Protective Coatingsq. ft.100085015
Deck
Reinforced Concrete Decksq. ft.1,93801,93620
Substructure
Reinforced Concrete Abutmentlinear ft.753330120
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.105010500
Steel Protective Coatingsq. ft.100100000
Reinforced Concrete Bridge Raillinear ft.105510000