Share:

COUNTY HIGHWAY over W BR TURKEY CREEK

Map

Coordinates:
+40.07217, -96.27036
40°04'20" N, 96°16'13" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:COUNTY HIGHWAY over W BR TURKEY CREEK
Structure number:C006702115
Location:5.7W 2.6S OF PAWNEE CITY
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:63.0 ft. [19.2 m]
Total length:65.0 ft. [19.8 m]
Roadway width between curbs:22.3 ft. [6.8 m]
Deck width edge-to-edge:22.3 ft. [6.8 m]
Owner:County Highway Agency [02]
Year built:1991
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: October 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:50 [as of 2003]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:38.0 tons [34.5 metric tons]
Inventory rating:23.0 tons [20.9 metric tons]
Sufficiency rating:77.3
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
October 201677.3GoodGoodGoodGoodFO50
October 201477.3GoodGoodVery GoodGoodFO50
October 201278.0GoodVery GoodVery GoodGoodFO50
October 201078.0GoodVery GoodVery GoodGoodFO50
November 200878.0GoodVery GoodVery GoodGoodFO50
November 200675.4GoodVery GoodVery GoodGoodFO50
December 200475.4GoodExcellentExcellentVery GoodFO50
September 200275.4GoodExcellentExcellentVery GoodFO50
November 200078.4GoodExcellentExcellentVery Good-50
September 199878.4GoodExcellentExcellentVery Good-50
December 199678.4GoodExcellentExcellentVery Good-50
November 199478.4GoodExcellentExcellentVery Good-50
August 199278.4GoodExcellentExcellentVery Good-50
August 199178.4GoodExcellentExcellentVery Good-50