Share:

PACIFIC ST/FAU5044 over BIG PAPILLION CREEK

Map

Coordinates:
+41.24875, -96.07929
41°14'56" N, 96°04'45" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:PACIFIC ST/FAU5044 over BIG PAPILLION CREEK
Structure number:U182522220
Location:PACIFIC @ 107TH ST
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:100.1 ft. [30.5 m]
Total length:241.2 ft. [73.5 m]
Roadway width between curbs:64.0 ft. [19.5 m]
Deck width edge-to-edge:71.9 ft. [21.9 m]
Skew angle:15°
Owner:City or Municipal Highway Agency [04]
Year built:1968
Year reconstructed:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: May 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:32,400 [as of 2010]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Structural appraisal:Equal to present desirable criteria [8]
Deck geometry appraisal:Better than present minimum criteria [7]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:67.9 tons [61.7 metric tons]
Inventory rating:40.9 tons [37.2 metric tons]
Sufficiency rating:84.9
Recommended work:Bridge deck replacement with only incidental widening. [37]

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
May 201684.9GoodVery GoodVery GoodVery Good-32400
May 201484.9GoodVery GoodVery GoodVery Good-32400
May 201272.1PoorPoorSatisfactoryFairSD32400
May 201071.3PoorPoorFairFairSD34700
April 200868.8PoorPoorFairFairSD42300
March 200670.2PoorPoorFairFairSD37900
June 200470.2PoorPoorSatisfactoryFairSD37900
December 200268.6PoorPoorGoodFairSD42700
October 200088.2PoorPoorGoodSatisfactorySD39700
May 199888.2PoorPoorGoodSatisfactorySD39700
August 199690.6FairFairGoodGood-38065
September 199490.5FairFairGoodGood-36550
June 199291.1FairFairGoodGood-32450
October 199088.0FairSatisfactoryGoodGood-32450