Share:

AK-SAR-BEN ACCESS over LITTLE PAPIO CREEK

Map

Coordinates:
+41.24500, -96.02000
41°14'42" N, 96°01'12" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:AK-SAR-BEN ACCESS over LITTLE PAPIO CREEK
Structure number:U1825D2201
Location:WOOLWORTH AVE @ 69TH ST
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:69.9 ft. [21.3 m]
Total length:142.1 ft. [43.3 m]
Roadway width between curbs:49.9 ft. [15.2 m]
Deck width edge-to-edge:59.1 ft. [18.0 m]
Skew angle:23°
Owner:Private (other than railroad) [26]
Year built:1961
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: May 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:1,000 [as of 2003]
Truck traffic:2% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:67.2
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2016FairFairGoodGood100067.2
May 2014FairFairGoodGood100067.2
May 2012FairFairGoodGood100069.8
May 2010FairSatisfactoryGoodGood100070.8
June 2008FairSatisfactoryGoodGood100070.8
May 2006FairSatisfactoryGoodGood100072.4
April 2004GoodGoodGoodGood100072.4
August 2002GoodGoodGoodGood100072.4
December 2001GoodGoodGoodGood100072.3
November 1998GoodGoodGoodGood100072.3
May 1996GoodGoodGoodGood100072.3
August 1994GoodGoodGoodGood100074.4
December 1992GoodExcellentExcellentExcellent100074.4