Share:

PEDESTRIAN WALKWAY over Rio Puerco

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+35.03333, -106.94000
35°01'60" N, 106°56'24" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:PEDESTRIAN WALKWAY over Rio Puerco
Structure number:000000000002530
Location:13.8 M E of Jct I-40/NM-6
Purpose:Carries pedestrian/bicycle trail over waterway
Route classification:Local (Urban) [19]
Tolls:Yes, on toll road [2]
Length of largest span:250.0 ft. [76.2 m]
Total length:253.0 ft. [77.1 m]
Year built:1933
Main span material:Steel [3]
Main span design:Truss - Thru [10]

Latest Available Inspection: August 1999

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:833 [as of 1998]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:44.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,020,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
August 1999PoorFairPoorSatisfactory83344.6
February 1992PoorFairPoorPoor43438.0