Share:

US 395 over GALENA CRK

Map

Coordinates:
+39.35417, -119.77500
39°21'15" N, 119°46'30" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:US 395 over GALENA CRK
Structure number:B 752
Location:PLEASANT VLY SOUTH OF REN
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:12.1 ft. [3.7 m]
Total length:24.9 ft. [7.6 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1960
Year reconstructed:1968
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: April 2015

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:5,700 [as of 2014]
Truck traffic:7% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:46.6 tons [42.4 metric tons]
Inventory rating:28.1 tons [25.5 metric tons]
Sufficiency rating:69.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$369,000

Previous Inspections

DateSuff. RatingConditionCulvert ConditionSD/FOADT
April 201569.2Good7 out of 10-5700
April 201364.1Good7 out of 10-31000
April 201164.1Good7 out of 10-31000
April 200959.0Fair5 out of 10-31000
April 200759.0Fair5 out of 10-31000
April 200559.0Fair5 out of 10-30500
May 200359.0Fair5 out of 10-36500
May 200159.0Fair5 out of 10-35000
May 199959.0Fair5 out of 10-32200
May 199759.0Fair5 out of 10-29400
May 199559.0Fair5 out of 10-25950
May 199367.0Good7 out of 10-25950
March 199167.0Good7 out of 10-24000