Share:

VENTURACCI ROAD over S-CANAL

Map

Coordinates:
+39.48679, -118.78611
39°29'12" N, 118°47'10" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:VENTURACCI ROAD over S-CANAL
Structure number:B1587
Location:WEST OF FALLON
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:12.8 ft. [3.9 m]
Total length:40.7 ft. [12.4 m]
Roadway width between curbs:32.8 ft. [10.0 m]
Deck width edge-to-edge:36.1 ft. [11.0 m]
Owner:County Highway Agency [02]
Year built:2003
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: February 2017

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:66 [as of 2014]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:82.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$232,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
February 2017Good7 out of 106682.1
February 2015Good7 out of 106678.1
February 2013Good7 out of 106678.1
February 2011Good7 out of 106669.0
February 2009Good7 out of 106669.0
February 2007Good7 out of 106073.0
February 2005Good7 out of 1010076.0
February 2003Good8 out of 106073.0
February 2002FairN out of 106061.0
March 2001FairN out of 106061.0
February 1999GoodN out of 106071.0
March 1997GoodN out of 106071.0
January 1995GoodN out of 105371.0
December 1992FairN out of 105371.0
December 1990GoodN out of 105071.0

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Culvert
Reinforced Concrete Culvertlinear ft.1383732690
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.8177400