Share:

RTE 417 over GENESEE RIVER

Map

Coordinates:
+42.12831, -77.96066
42°07'42" N, 77°57'38" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:RTE 417 over GENESEE RIVER
Structure number:000000001012450
Location:JCT SR 417 & GENESEE RIVE
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:91.9 ft. [28.0 m]
Total length:238.9 ft. [72.8 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:47.2 ft. [14.4 m]
Owner:State Highway Agency [01]
Year built:1988
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

Latest Available Inspection: June 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:9,907 [as of 2014]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:80.9 tons [73.5 metric tons]
Inventory rating:47.9 tons [43.5 metric tons]
Sufficiency rating:62.7
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$2,765,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201662.7FairGoodSatisfactoryGood-9907
May 201463.7FairSatisfactoryGoodGood-9907
May 201263.7FairSatisfactoryGoodGood-13100
June 201063.7FairSatisfactoryGoodGood-13122
June 200863.7FairSatisfactoryGoodGood-13122
June 200663.7FairSatisfactoryVery GoodGood-13766
June 200467.5FairSatisfactoryVery GoodGood-2148
June 200263.7FairSatisfactoryGoodGood-7803
June 200063.7FairSatisfactoryGoodGood-7803
June 199868.4FairSatisfactoryGoodGood-1811
June 199669.7FairSatisfactorySatisfactorySatisfactory-1724
June 199485.3FairSatisfactoryVery GoodSatisfactory-2528
May 199285.6FairVery GoodVery GoodSatisfactory-1507
April 199085.4FairVery GoodVery GoodSatisfactory-2267