RTE 42 over WEST KILL
Map
Coordinates:
+42.23314, -74.3920542°13'59" N, 74°23'31" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | RTE 42 over WEST KILL |
Structure number: | 000000001025200 |
Location: | RT 42 6.4 MI N ULSTER CO |
Purpose: | Carries highway over waterway |
Route classification: | Major Collector (Rural) [07] |
Length of largest span: | 149.9 ft. [45.7 m] |
Total length: | 151.9 ft. [46.3 m] |
Roadway width between curbs: | 29.9 ft. [9.1 m] |
Deck width edge-to-edge: | 33.1 ft. [10.1 m] |
Skew angle: | 30° |
Owner: | State Highway Agency [01] |
Year built: | 2011 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Main span material: | Steel [3] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Precast Panels [2] |
Wearing surface: | Integral Concrete (separate non-modified layer of concrete added to structural deck) [2] |
Latest Available Inspection: June 2018
Good/Fair/Poor Condition: | Good |
Status: | Open, no restriction [A] |
Average daily traffic: | 753 [as of 2016] |
Truck traffic: | 9% of total traffic |
Deck condition: | Excellent [9 out of 9] |
Superstructure condition: | Excellent [9 out of 9] |
Substructure condition: | Excellent [9 out of 9] |
Structural appraisal: | Superior to present desirable criteria [9] |
Deck geometry appraisal: | Equal to present minimum criteria [6] |
Water adequacy appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Roadway alignment appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 90.5 |
Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
Estimated cost of work: | $1,834,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
June 2018 | Good | Excellent | Excellent | Excellent | 753 | 90.5 |
June 2016 | Good | Excellent | Excellent | Excellent | 758 | 90.5 |
June 2014 | Good | Excellent | Excellent | Excellent | 732 | 94.5 |
May 2012 | Good | Excellent | Excellent | Excellent | 850 | 90.2 |
July 2011 | Poor | Fair | Fair | Poor | 850 | 24.4 |
November 2009 | Fair | Good | Fair | Fair | 857 | 57.4 |
June 2007 | Fair | Good | Fair | Fair | 857 | 57.4 |
July 2005 | Fair | Good | Fair | Fair | 1003 | 56.7 |
October 2003 | Fair | Good | Fair | Fair | 1003 | 56.7 |
June 2001 | Fair | Good | Fair | Fair | 1003 | 57.8 |
June 1999 | Fair | Good | Fair | Fair | 1003 | 55.8 |
June 1997 | Fair | Satisfactory | Fair | Fair | 1082 | 54.4 |
June 1995 | Fair | Satisfactory | Fair | Fair | 1082 | 53.4 |
June 1993 | Fair | Satisfactory | Fair | Fair | 941 | 54.1 |
April 1991 | Fair | Satisfactory | Fair | Satisfactory | 989 | 53.8 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Steel Girder/Beam | linear ft. | 604 | 604 | 0 | 0 | 0 |
Steel Protective Coating | sq. ft. | 9,785 | 9,785 | 0 | 0 | 0 |
Deck |
Reinforced Concrete Deck | sq. ft. | 5,065 | 5,065 | 0 | 0 | 0 |
Wearing Surfaces | sq. ft. | 4,571 | 4,571 | 0 | 0 | 0 |
Substructure |
Reinforced Concrete Abutment | linear ft. | 116 | 116 | 0 | 0 | 0 |
Bridge Rail |
Steel or Aluminum Bridge Rail | linear ft. | 304 | 304 | 0 | 0 | 0 |
Steel Protective Coating | sq. ft. | 1,579 | 1,579 | 0 | 0 | 0 |